Lighthouse Church, Calgary, starts Phase II of the Torres' home; adding Foam Insulation to outside walls.
Lighthouse Church, Calgary, starts Phase II of the Torres' home; adding Foam Insulation to outside walls.
Viewed: 206 times.

Andres & Sherri stretch 'sticky' wire (called 'maya') over the insulation in preparation for adding stucco.
Andres & Sherri stretch 'sticky' wire (called 'maya') over the insulation in preparation for adding stucco.
Viewed: 209 times.

Ed drywalls master bedroom; another phase of the construction project which adds a blessing to the Torres' family home.
Ed drywalls master bedroom; another phase of the construction project which adds a blessing to the Torres' family home.
Viewed: 248 times.

Miguel (home owner) & Sergio (who had his home built by Canadian teams) stuccoing.
Miguel (home owner) & Sergio (who had his home built by Canadian teams) stuccoing.
Viewed: 208 times.

Pastor Frank and Ed: Bathroom & drywall project.
Pastor Frank and Ed: Bathroom & drywall project.
Viewed: 214 times.

Pastor Frank & Miguel prepare soffits with wire mesh for 'breathing'; later, they added plywood to cover the rest.
Pastor Frank & Miguel prepare soffits with wire mesh for 'breathing'; later, they added plywood to cover the rest.
Viewed: 246 times.

Andres 'relaxes' after living room & kitchen are completed: drywall on walls and foam insulation on the ceiling.
Andres 'relaxes' after living room & kitchen are completed: drywall on walls and foam insulation on the ceiling.
Viewed: 214 times.

The Torres' home as completed by the two groups: exterior covered with Stucco (Crestuco).
The Torres' home as completed by the two groups: exterior covered with Stucco (Crestuco).
Viewed: 200 times.

Lighthouse Church team enjoy fellowship on their final evening in San Felipe with one of the church's home groups.
Lighthouse Church team enjoy fellowship on their final evening in San Felipe with one of the church's home groups.