Lighthouse Church, Calgary, starts Phase II of the Torres' home; adding Foam Insulation to outside walls.
Viewed: 206 times.
|
Andres & Sherri stretch 'sticky' wire (called 'maya') over the insulation in preparation for adding stucco.
Viewed: 209 times.
|
Ed drywalls master bedroom; another phase of the construction project which adds a blessing to the Torres' family home.
Viewed: 248 times.
|
Miguel (home owner) & Sergio (who had his home built by Canadian teams) stuccoing.
Viewed: 208 times.
|
Pastor Frank and Ed: Bathroom & drywall project.
Viewed: 214 times.
|
Pastor Frank & Miguel prepare soffits with wire mesh for 'breathing'; later, they added plywood to cover the rest.
Viewed: 246 times.
|
Andres 'relaxes' after living room & kitchen are completed: drywall on walls and foam insulation on the ceiling.
Viewed: 214 times.
|
The Torres' home as completed by the two groups: exterior covered with Stucco (Crestuco).
Viewed: 200 times.
|
Lighthouse Church team enjoy fellowship on their final evening in San Felipe with one of the church's home groups.
Viewed: 246 times.
|