SAN FELIPE... WINTER 2007-2008 
Aaron, Miguel, & David standing in doorway where the front door will be set.
Aaron, Miguel, & David standing in doorway where the front door will be set.
Viewed: 138 times.

Graham, Aaron, and David with completed front door.
Graham, Aaron, and David with completed front door.
Viewed: 147 times.

Other Millarville team members drywall Heriberto and Natalia's home (constructed in April 2007).
Other Millarville team members drywall Heriberto and Natalia's home (constructed in April 2007).
Viewed: 137 times.

Sara Fay; Olivia, & Elizabeth carrying drywall.
Sara Fay; Olivia, & Elizabeth carrying drywall.
Viewed: 136 times.

Team leader and pastor, Allan, with daughter, Olivia, attaching drywall.
Team leader and pastor, Allan, with daughter, Olivia, attaching drywall.
Viewed: 138 times.

Transforming the living room and dining room.
Transforming the living room and dining room.
Viewed: 125 times.

Millarville team poses with the Mesa family for a Group photo... drywall and foam insulation (ceiling) completed.
Millarville team poses with the Mesa family for a Group photo... drywall and foam insulation (ceiling) completed.
Viewed: 156 times.

Dave & Pastor Salvador with 7 brothers in Christ from Guerrero Negro (all of whom are Christians; converted from dealing drugs) Juan, Fabricio, Jorge, Elian, Roberto, Joel, Jose Angel.
Dave & Pastor Salvador with 7 brothers in Christ from Guerrero Negro (all of whom are Christians; converted from dealing drugs) Juan, Fabricio, Jorge, Elian, Roberto, Joel, Jose Angel.
Viewed: 115 times.

Dave and Beth with students from their Tuesday evening Missions and English classes.
Dave and Beth with students from their Tuesday evening Missions and English classes.
Viewed: 143 times.

Powered by Gallery v1